CPS Infraestructuras Movilidad y Medio Ambiente S.L.

North Ringroad of Valencia CV30

Portfolio Detail

Regional Ministry for Infrastructure and Transport - Valencia (Spain)

img1
img2
img1
img2
img1
img2
img1
img2
img2
img2
img2
img2
img2

North ringroad of Valencia (CV-30) Benimaet to Ciutat Fallera and connections to Burjassot, Benimamet, CV-30 and the future north park road.

SCOPE OF THE WORKS

The Regional Ministry for Public Works (Conselleria d’Infrastructures i Transports) has planned the CV-30 ring road as a north eastern distributor road of those areas closest to the city of Valencia. Currently, the section running from the connection between the V-30 and the west slip road in Quart de Poblet to the Maestro Rodrigo junction is already built and in service.

TASKS PERFORMED
  • Study of the works contract documents
  • Review of the project
  • Works logbook
  • Check for changes in the specifications
  • Check building equipment
  • List the constructor workers and employees
  • Revision and approval of minutes
  • Unified awards for concepts in extra works
  • Environmental management supervision
  • Quality control at work
WORKS DESCRIPTION

Of all the works included in the project, two are worth highlighting:

  • STRUCTURES ON THE LLIRIA HIGHWAY INTERSECTION: Planned as a two-level directional intersection, this is a mixed double structure measuring 106 metres in length, with three spans of 32, 42 and 32 metres, and a mixed structure curving over 84 metres in four openings for the turning slip road on an intermediate height between the North Ring Road and the CV-35.
  • METRO AND TRAMWAY UNDERPASS: This was carried out using a 46 metre wide, 32 m long and 6.30 metre high box jack. The box jack was built elsewhere and installed underneath the tram lines in successive stages of provisional stabilising, hydraulic jacks and back-fill covering a total distance of 33 metres.