Valencia Port Authority - Spain





Execution of a mobile swing-type bridge over the exit channel of the inner harbor basin of the Port of Valencia, re-using as long as possible the materials belonging to the mobile bascule bridge located over the former harbor mouth. The bridge will convert from rail use to road use. The requirements of its new location along with its new use have led to the modification of the deck making it longer and wider. Perform the tasks established in the Royal Decree 1627/1997, of October 24, including the previous revision of the Health and Safety Plan with the drafting of the corrections report, the favorable report of the Plan, and the follow-up of the work through follow-up visits to the works, with the preparation of the visit report.